少妇无码精品23p_亚洲一区无码电影在线观看网站 _悠悠色一区二区_中文字幕亚洲无码第36页

Home Tools: Save | Print | E-mail | Most Read | Comment
Olympic Village profile
Adjust font size:

Profile

The Olympic Village lies in the northwest corner of the Beijing Olympic Green, with the Olympic competition venues to its south and the Forest Park to its north.

The Village, with an area of 66 hectares, includes the Apartment Buildings for athletes in the south and the overlay area in the north.

During the Olympic Games, the Olympic Village can accommodate more than 16,000 athletes and officials (7,000 athletes and officials during the Paralympic Games) and provide services related to accommodation, living, training, leisure, entertainment, etc.

The Residential Zone

The Residential Zone has an area of 27.55 hectares and a floor area of 524,000 square meters. They include 20 9-storey buildings, 22 6-storey buildings, 3 Super Resident Centres, 9 Resident Centres and facilities, such as the Polyclinic and the Casual Dining Hall. Overlay area in the north

The overlay area in the north of the village will provide services including arrival, accreditation, leisure, catering, fitness, departure, etc. for athletes coming to the Olympic and Paralympic Games.

There will be the Welcome Ceremony Stage, the Village Mayor Office, the Dining Hall, the shopping centre, the logistics centre, the accreditation centre, etc.

Construction

The Structural Engineering: outer facade is fitted up and the indoor fine decoration has been completely largely.

Water supply and drainage system: the pipes to supply water for daily life, potable water, reclaimed water for flushing toilets, hot water for shower, and water for fire fighting have been installed. Sewers have been installed.

The electrical equipment: outdoor power system, switching station, electricity distribution room, room lighting and indoor panel box systems have been installed. And the full loading operation has been carried out. The elevator has been installed. The construction of the intelligent systems (building automation, fire control, office, security, communication, automatic control) has entered the final stage.

Air conditioning and heating: the first phase commissioning of air conditioning was completed in September 2007. The heating for winter is underway.

Landscape project: the engineering for road surface course, outdoor lighting, green space and water system, enclosure and gate is close to the end. Main building and outdoor engineering have been completed largely The public space, such as staircases and elevator halls, has been fitted up The indoor fine decoration has been completed largely Water supply and drainage system and sanitary wares have been installed. The elevations have been installed

Air conditioning system with water reclamation heat pumps has been put into operation.

Follow-up

Before Lockdown (begins on July 8th, 2008): The full loading test is scheduled to be carried out according to the actual need during the Games-time. During the test, the shower water, potable water, tap water, drainage, outdoor and indoor lighting, elevator, intelligentization and other systems will be tested; the water reclamation heat pump system will be put into operation for cooling purpose with automatic control; the BOCOG operation team will move in; FF&E and other facilities will be loaded in.

The opening and closing of the Village: The Olympic Village will open on July 27, 2008 and close on August 28, 2008. The Paralympic Village will open on August 30 and close on September 20.

Application of the three concepts of the Olympic Games

The following green technologies have been applied: renewable energy, water reclamation, utilization of rain and flood, green building materials, energy-saving building, green indoor environment, ecological landscape, intelligent house, DTV, and green lighting, accessible facilities. The harmony between culture, architecture and environment has been achieved in the green residential area. The village, with its world leading technology, has showcased to the world the distinguishing characteristics of the high level Olympic Games.

The whole process of the construction illustrates the “three concepts”. For example, slag was used to pave the lanes at the construction sites; solar energy adopted for lighting; water sprayed to remove dust; water permeation bricks paved.

Utilization of renewable energy

Renewable energy utilized to save energy and cut emission During the Games-times, 7,890,000 kilowatt hours will be obtained from solar energy and reclaimed water for services.

After the Olympic Games, 67 million kilowatt hours will be obtained from solar energy and reclaimed water.

The reclaimed water heat pump air conditioning system

The system draws energy through heat exchange from the reclaimed water from the Qinghe Wastewater Treatment Plant and discharges the water to the rivers. During the process, the water quality will not change and water will not lessen while the energy in the reclaimed water can be utilized. The energy drawn from the reclaimed water can be enhanced by the heat pumps for heating and cooling. The system consumes electricity 40% less than the ordinary air conditioners. Thanks to the world leading wastewater utilization system, cooling towers or outdoor machines are not needed, no noise or smoke will be generated, and the heat island effect can be removed completely.

Integrated solar energy water heating system

The solar energy heating pipes are installed horizontally in the gardens on the roofs, constituting part of the pergola and thus integrated into the garden. 6,000 square metres solar energy water heating system can provide bathing hot water for more than 16,000 athletes. After the Olympic Games, it can provide hot water for nearly 2,000 households nearby.

All the details of the solar energy water heating system have been taken into consideration. They include heat collection, heat exchange, heat preservation, sterilization, heat source backup, waste heat utilization, automatic control, etc. The indirect cycle heat exchange is adopted in the system, featuring independent operation, consistent water temperature, easy maintenance and easy calculation. The solar energy water heating system can save 5 million kilowatt hours electric power per year. The scale and cutting edge technology have excelled those of the previous Olympic Games.

The solar collectors have been installed Street lamps with Solar/Wind Hybrid Power

Solar energy street lamps, garden lamps, lawn lamps, light pipes, green lighting such as LED lighting have been used to make the Olympic nights even more colorful.

Micro energy consumption building (Super Resident Center)

More than 20 cutting edge technologies, such as solar heat collection, solar water heating, solar dehumidification, cogeneration of heat and power by solar energy, windmill power generation, air conditioning by geo thermal heat pumps, vacuum windowpane, intellectual control, etc. have been applied in the micro energy consumption buildings. For 2,000 square metres of the micro energy consumption buildings, each square metre will consume 36 kilowatt hours annually, which is 1/3rd of the consumption of the existing energy saving buildings. 147,000 kilowatt hours of energy can be saved yearly.

Energy-saving buildings

Outer building enclosure heat preservation system

Thickened XPS extruded sheets have been used for walls and building surfaces, with heat transfer coefficient at 0.38w/ ㎡ .k. It can save energy while preserving heat. The heat insulation can make the buildings cool in summer and warm in winter.

Double-glazing LOW-E windowpanes

The double-glazing LOW-E glass with inert gases fill framed by aluminum has been used. The glass features thermal insulation and noise prevention. The K value (heat transfer coefficient) is close to 2.0. It can reduce the noise by 40db. The coating is of low radiant ratio. Such super thing low radiation coating can reflect most of the heat back to the room to prevent heat loss in winter. It can block the outdoor sun radiation in summer. The gas fill can cut the sound transmission to reduce noise while presenting good view.

Energy-saving Persian blinds

The heat transfer coefficient of the sealed insulating glass adopted for the Persian blinds is lower than ordinary ones. Therefore, it can save energy significantly. The blinds will be put into the cavity between the two layers of glass. The blinds can block solar radiation when closed to cut the energy consumption by the air conditioners. The blinds can absorb solar heat to keep the inside warm when opened. The magnetic system sealed within can control the movement of the slats. Thus, the solar radiation can be blocked while the view can be presented.

Environmental Protection

Biological sewage treatment technology used in landscape flowers house Biological sewage treatment technology is adopted in the Olympic Village to treat part of domestic waste water and also to provide water for landscape. Simulating the self-purification capacity of water, a water body biological balance system applying food chains of animals and plants is set up to treat the domestic water in a comprehensive way. In this way 200 tons of water can be provided to water the landscape.

Diagram of rain and flood water utilization

6000 m3of water can be collected and reused every year to water the green space and clean the road.

Application of environmental-friendly materials

In order to ensure a good indoor environment, construction materials(including cement, concrete, mixture, water reducing agent, wall materials, glass and glass wares, sanitary ceramics, doors and windows, water-proof materials) and decoration materials(artificial boards and products, coatings and paints, adhesives ) have been tested and undergone pre-control process during the construction. The environmental protection indicators of all these materials surpass the national standard E1, and reach E0 standard required by the Environmental Protection Guide of Olympic Projects.

High standard environmental-friendly paint

Quality Titanium dioxide white paint and wall paint with innovative environmental protection technology used in the Olympic Village are stain resistant and durable. The paint does not include heavy metals, content of the VOC(volatile organic compounds) and formaldehyde is close to zero.

Human oriented design ?Accessible design system Outdoors—Accessible ramps and blind sidewalks are set. The entrance and exit of apartments are level with the outside roads. Outdoor roads are higher than green space. Overhead wood plastic board is used to connect entrance and exit of a building with the outside roads, thus protecting the green space and facilitate people with walking difficulties. Public space—Accessible ramps and hand rails are installed at the main entrance of apartments and public facilities. Lifts tailor made for people with a disability are 900mm wide and accommodative for wheelchairs. Horizontal operating panels are provided in the lifts. Indoors—Accessible facilities are installed indoors. An accessible toilet is installed in each apartment on the ground, first and second floor, where sanitary wares and equipments up to the accessible design are used.

?High standard potable water system The deeply purified potable water (neutral Ph) tastes cool. Water goes through O3, activated carbon, ultrafiltration, nanofiltration, finished water storage tank, Catalyze Oxidation Sterilization, activated carbon, frequency conversion and pressure before reaching the users. Water is supplied around the clock thus avoiding the second time pollution in the pipelines. So high quality potable water is provided in the Olympic Village.

Excerpts from the BEIJING 2008 OLYMPIC GAMES - AN ENVIRONMENTAL REVIEW by UNEP: The venue features innovative technologies, such as a heat pump system, photovoltaic panels, beam-pipe illumination, solar collectors, water saving devices, and rainwater collection. The designers have succeeding in designing a people-oriented, healthy, comfortable and energy-saving environment in the Village.

(China.org.cn March 5, 2008)

Tools: Save | Print | E-mail | Most Read
Comment
Pet Name
Anonymous
China Archives
Related >>
Most Viewed >>
- A deal or a steal?
- White paper published on China's rule of law
- Nation vows full protection of IPR
- Presidium, agenda set for parliamentary session
- Illegal mining firms focus of campaign

Product Directory
China Search
Country Search
Hot Buys
一级女性全黄生活片免费| 国产极品精频在线观看| 香蕉视频亚洲一级| 成人a级高清视频在线观看| 日本特黄特色aaa大片免费| 久久国产精品永久免费网站| 九九干| 欧美国产日韩久久久| 成人在免费观看视频国产| 精品久久久久久免费影院| 欧美日本免费| 精品国产一区二区三区精东影业| 日日夜夜婷婷| 国产亚洲免费观看| 天天色成人网| 日本免费乱理伦片在线观看2018| 美国一区二区三区| a级毛片免费观看网站| 国产精品1024永久免费视频| 亚洲 国产精品 日韩| 国产美女在线观看| 亚洲精品中文一区不卡| 国产美女在线一区二区三区| 久久久久久久免费视频| 青青久久精品国产免费看| 精品在线免费播放| 欧美电影免费看大全| 四虎影视库| 国产亚洲精品成人a在线| 久久国产精品自由自在| 精品国产一区二区三区久| 免费毛片基地| 国产成人精品一区二区视频| 日本特黄特黄aaaaa大片| 国产a视频精品免费观看| 日韩欧美一二三区| 精品国产一区二区三区免费 | 青青久久国产成人免费网站| 91麻豆精品国产片在线观看| 日本在线播放一区| 国产成人啪精品| 日韩中文字幕一区二区不卡| 欧美激情在线精品video| a级毛片免费全部播放| 成人影视在线观看| 精品视频一区二区三区免费| 99热视热频这里只有精品| 久久国产精品自线拍免费| 可以免费看毛片的网站| 久久精品免视看国产明星| 精品国产一区二区三区免费 | 一级毛片视频播放| 国产一区二区精品在线观看| 国产一区二区精品尤物| 九九免费精品视频| 日韩在线观看视频黄| 91麻豆精品国产综合久久久| 麻豆污视频| 精品国产一级毛片| 韩国毛片| 四虎影视久久久免费| 国产一区二区精品尤物| 日韩在线观看视频黄| 久久精品免视看国产明星| 欧美激情一区二区三区视频高清 | 亚欧视频在线| 成人免费观看男女羞羞视频| 久久成人性色生活片| 亚洲精品影院一区二区| 麻豆污视频| 你懂的国产精品| 99热精品在线| 高清一级做a爱过程不卡视频| 黄视频网站在线看| 成人免费福利片在线观看| 九九精品在线| 91麻豆精品国产自产在线 | 青青久久精品| 99热视热频这里只有精品| 免费的黄视频| 久久国产精品只做精品| 亚洲第一视频在线播放| 精品国产一区二区三区免费 | 四虎久久精品国产| 国产伦精品一区三区视频| 国产a视频| 国产成人欧美一区二区三区的| 国产成人欧美一区二区三区的| 天堂网中文在线| 亚洲精品永久一区| 99热视热频这里只有精品| 午夜激情视频在线观看| a级黄色毛片免费播放视频| 九九九网站| 国产91素人搭讪系列天堂| 青青久久国产成人免费网站| 91麻豆精品国产自产在线 | 日韩中文字幕一区二区不卡| 久久国产一久久高清| 欧美电影免费| 精品国产一区二区三区久久久蜜臀 | 精品久久久久久中文字幕一区| 久久99中文字幕| 日日爽天天| 精品久久久久久影院免费| 日韩中文字幕一区二区不卡| 日韩专区一区| 99热视热频这里只有精品| 亚洲天堂在线播放| 国产美女在线观看| 欧美爱色| 99热视热频这里只有精品| 青青青草影院| 一本高清在线| 免费的黄视频| 欧美另类videosbestsex高清| 可以免费在线看黄的网站| 成人a级高清视频在线观看| 欧美激情伊人| 台湾毛片| 国产一区二区精品久久91| 久久久久久久免费视频| 国产国语在线播放视频| 久久久久久久久综合影视网| 精品国产一区二区三区精东影业| 久久国产一区二区| 一级毛片视频免费| 韩国毛片基地| 可以免费看污视频的网站| 美女被草网站| 国产视频一区二区三区四区| 亚洲精品久久久中文字| 免费国产在线观看| 日韩中文字幕一区| 亚洲精品久久久中文字| 日韩在线观看视频黄| 美女被草网站| 国产精品自拍亚洲| 天天色成人网| 亚欧成人乱码一区二区 | 国产一区二区精品| 精品国产一区二区三区免费| 精品视频在线观看视频免费视频| 欧美夜夜骑 青草视频在线观看完整版 久久精品99无色码中文字幕 欧美日韩一区二区在线观看视频 欧美中文字幕在线视频 www.99精品 香蕉视频久久 | 国产原创中文字幕| 日韩欧美一二三区| 日本伦理片网站| 天天做日日干| 日韩免费在线| 免费一级生活片| 午夜激情视频在线观看| 国产一级强片在线观看| 欧美夜夜骑 青草视频在线观看完整版 久久精品99无色码中文字幕 欧美日韩一区二区在线观看视频 欧美中文字幕在线视频 www.99精品 香蕉视频久久 | 99久久精品国产国产毛片| 国产伦精品一区二区三区在线观看 | 国产成人精品综合久久久| 久久国产影院| 日韩在线观看免费| 国产精品免费久久| 欧美日本二区| 好男人天堂网 久久精品国产这里是免费 国产精品成人一区二区 男人天堂网2021 男人的天堂在线观看 丁香六月综合激情 | 毛片的网站| 精品毛片视频| 久久精品店| 美女免费毛片| 国产视频网站在线观看| 一级女人毛片人一女人| 国产成a人片在线观看视频| 日本特黄特色aaa大片免费| 日韩专区亚洲综合久久| 日本特黄特色aaa大片免费| 国产一区免费在线观看| 国产成a人片在线观看视频| 日本久久久久久久 97久久精品一区二区三区 狠狠色噜噜狠狠狠狠97 日日干综合 五月天婷婷在线观看高清 九色福利视频 | 999久久66久6只有精品| 国产高清在线精品一区二区| 韩国三级视频网站| 99久久网站| 青青久热| 一级女性全黄久久生活片| 久久国产精品自由自在| 天天做日日干| 日韩女人做爰大片| 日韩综合| 91麻豆爱豆果冻天美星空| 日本特黄一级| 99久久精品国产麻豆| 国产不卡精品一区二区三区| 欧美国产日韩一区二区三区| 99久久网站| 国产网站免费视频| 久久国产影院| 精品国产一区二区三区国产馆| 高清一级片| 国产伦精品一区三区视频| 国产一区二区精品久久91| 欧美a免费| 欧美a级片免费看| 91麻豆tv| 精品视频在线看 |